28 Aug Woodbridge Jetty Replacement
The concrete jetty is 195m2 and has a lower landing stage on either side....
The concrete jetty is 195m2 and has a lower landing stage on either side....
Demolish existing bridge. Design and construct new concrete four span bridge total length 42m. The new, 12m wide, single span bridge had to be complete before Christmas 2018 to allow passage of heavy wind farm construction equipment. TMC were given the challenge of accelerating its...