Two new wharfs on a green field site in Macquarie Harbour, west coast Client: Fairbrother Date completed: December  2014 Description of works: $3.4M Details of Innovations and extra value for money: We were able to offer a redesign of the tendered design and saved the client around 2M. Client Contact:Mr John Cornell -...

Jetty demolition and replacement with reinforced concrete structure. New fenders, bollards, curbs ladders services. Client: Marine and Safety Tasmania Date completed: March 2015 Description of works: $2.1M Details of Innovations and extra value for money: MAST had relatively recently rebuilt parts of the deck so there was some sound re-usable timber in...

Jetty extension at Christmas Island in the Indian Ocean. Transport all plant and materials out to the Island, drive piles, some of which went 56m into the ground before they reached capacity. All site fabricated heavy steel sections, paint system and denso steelcoat400 corrosion protection....

240m long piles break-wall. Average 10m water depth, painted steel steel piles driven, precast headstocks, concrete pour. 13t precast wave panels and underwater bolted connections. Client: MONA Date completed: Under construction Description of works: $1M Details of Innovations and extra value for money: We used two barges on the same job and...

Drive 20 piles, most on 60 degree rake, construct 4m x 4m headstocks 2m underwater using coffer dam. 300t of precast elements including some 35t Client: MONA Date completed: June 2017 Description of works: $1M  ...

Drive piles for abutments, form up and pour concrete abutments, build timber trusses out of Durability 1 ironbark hardwood. Install with crane, deck with ‘replas’ decking Client: Kingbrough Council Date completed: August 2013 Total contract sum: 17k   ...

Build new bridge in virgin location between two golf clubs in Tasmania’s north east coast. Client had purchased second hand bridge decks and we were given the design and construct contract. The bridge was 70m long and 4.2m wide. Client: Barnbougle Lost Farm Golf Club Date completed: Dec 2012 Description...