Zeehan bridge demolition and replacement

Demolish existing bridge. Design and construct new concrete four span bridge total length 42m. The new, 12m wide, single span bridge had to be complete before Christmas 2018 to allow passage of heavy wind farm construction equipment. TMC were given the challenge of accelerating its program and successfully completed on time.

Zeehan Bridge Demolition and replacement

The new, 12m wide, 42m length single span bridge had to be complete before Christmas 2018 to allow passage of heavy wind farm construction equipment. TMC were given the challenge of accelerating its program and despite the west coast weather successfully completed on time.

Kingston Timber Footbridge

Drive piles for abutments, form up and pour concrete abutments, build timber trusses out of Durability 1 ironbark hardwood. Install with crane, deck with ‘replas’ decking Client: Kingbrough Council Date completed: August 2013 Total contract sum: 17k  

Glamorgan Spring Bay – Three Bridge replacement

Demolish and replace three old timber bridges on the east coast. All were single span, two required new piles abutments and one at rocky hills had convict built dry stone abutments which had to be repaired in the same traditional technique. Client: Glamorgan Spring Bay Date completed: March 2014     Description of works: $300k Details of […]

Kangaroo Bay opening foot bridge across BYC slipway

Off-site manufacture and installation of moving footbridge across the BYC slipway. There were two sets of hydraulic gates which open and shut to close the bridge off to pedestrian traffic then the bridge rolls back into a recess to open up the span. The whole system is electric over hydraulic. Fabrication by Saunders and Ward […]

Barnbougle Bridge

Build new bridge in virgin location between two golf clubs in Tasmania’s north east coast. Client had purchased second hand bridge decks and we were given the design and construct contract. The bridge was 70m long and 4.2m wide. Client: Barnbougle Lost Farm Golf Club Date completed: Dec 2012 Description of works: $250k Details of […]

Rotherwood Bridge Re-Deck

Construct piles footings for new single span bridge. Drive piles to refusal using excavator mounted hydraulic drop hammer. Form up and pour abutments. Take delivery and install precast wingwalls and decks Client: Southern Midlands council Date completed: May 2015 Description of works: $170k Details of any Innovations or extra value for money: We used a […]

Kingston Farm Bridge

Construct piles footings for new single span bridge. Drive piles to refusal using excavator mounted hydraulic drop hammer. Form up and pour abutments. Take delivery and install precast wingwalls and decks Client: Spring farm developments Date completed: June 2017 Description of works: $65k Details of any Innovations or extra value for money: We were able […]

Bellevale Bridge

Demolish existing bridge. Design and construct new concrete four span bridge total length 42m Client: Southern Midlands council Date completed: June 2017 Description of works: $350k Details of any Innovations or extra value for money: We used our long range piling capabilities to spin the piles into rock then drive to refusal form 20m away […]