Marine Construction

Demolish existing jetty, build two extra lanes on boat-ramp and re-place existing two lane boat-ramp. Extend existing Bellingham pontoon and supply and install new matching pontoon system on the other side. Client: Wellington Shire Council (Gippsland Vic)  Date completed: May 2018 Description of works: $1.1M Details of and innovation or extra value...

Two 5 x 5 m concrete dolphins on 6 piles each. Down the hole hammer drilling of all piles, Tension testing to 40t Client: DSS Date completed: December 2017 Description of works: $1M Details of Innovations and extra value for money: We battled almost constant rain to build this over winter. Client Contact:Daryl...

Demolish existing jetty, build new jetty using turpentine piles and durability 1 hardwood superstructure. Client: MAST Date completed: Under construction Description of works: $1.3M Details of Innovations and extra value for money: We were able to offer turpentine piles at the some cost of treated Tassie hardwood piles. The turpentine piles last...

Demolish part of old wharf and build new dolphin consisting of 5, 450 x 12.7 steel piles, and concrete head. Client: Nyrstar Date completed: Feb 2011 Description of works: $240,000 Details of Innovations and extra value for money: TMC was able to spin piles 4m into the underlying rock then drill down...

Build new jetty and hydraulic gangway, demolish old jetty. Piles installed into solid rock, onsite fabrication blasting and painting. Client: Port Arthur Historic Site Management Date completed: Sep 2011 Description of works: $600,000 Details of Innovations and extra value for money: We were able to keep the existing jetty open for most...

Demolition of existing wharf and construction of 80m retaining wall type wharf. Drive 21no 400 CHS piles up to 20m long within 25mm position tolerance. Dredging 800 tonnes of material out of the river. Installation of 18no 13 tonne precast panels. Timber works, concrete cast...

Replacement of Southport wharf with concrete and steel structure. Designed by GHD, 60 x  400 diameter steel piles with poly sleeves, precast headstocks and precast planks. Structure is 120m long with 3.6 wide jetty and 11m wide wharf out the end. Client: Marine and Safety Tasmania Date completed: April...