22 May Rotherwood Bridge Re-Deck
Construct piles footings for new single span bridge. Drive piles to refusal using excavator mounted hydraulic drop hammer. Form up and pour abutments. Take delivery and install precast wingwalls and decks
Client: | Southern Midlands council |
Date completed: | May 2015 |
Description of works: | $170k |
Details of any Innovations or extra value for money:
We used a neat connection detail to the existing steel beams to allow the new RC concrete deck to be at the same height as the old timber deck even though they were a shallower element.
Our crane was iread for picking up and carrying the new 10t precast slabs meaning the bridge was only closed for a short period
Client Contact: Phil Gee