Zeehan bridge demolition and replacement

Zeehan bridge demolition and replacement

Demolish existing bridge. Design and construct new concrete four span bridge total length 42m. The new, 12m wide, single span bridge had to be complete before Christmas 2018 to allow passage of heavy wind farm construction equipment. TMC were given the challenge of accelerating its program and successfully completed on time.

Client: DSS 
Date completed: December 2018
Cost of works: $1M

Details of and innovation or extra value for money:

We used mostly our own gear to construct this bridge. We worked with ‘The Precasters’ to build the first prestressed bridge decks built in Southern Tasmania for some time.