Partner With Us

Your Project, Our Priority.

Get In Touch

At Tas Marine, building strong and trusted relationships with our clients is at the heart of everything we do.

Our successful track record reflects our commitment to fostering long-term partnerships built on trust, reliability, and exceptional outcomes.

Please do not hesitate to contact us to discuss how we can support your next project and deliver high-quality results together.

Phone

+61419 358 468

Email:

tomwilcox@tasmarine.com.au

Address:

PO Box 123 Lindisfarne TAS 7015

Careers at Tas Marine Construction

We’re always looking for passionate people to join our team! Whether you’re an apprentice, site worker, engineer, or project manager – reach out to us in the Contact Us form to express your interest.

Bellerive Stormwater Upgrade

Client: City of Clarence

Date Completed: May 2025

Total Contract Sum: $1.2M

Description of works:

Tas Marine delivered Clarence City Council’s largest infrastructure project to date, including constructing a temporary sheet pile cofferdam across Bellerive Beach to enable excavation for a new stormwater outfall. Over 200 tonnes of steel were installed using specialised equipment. The new upgrade reduces flood risk to surrounding residential areas and supports long-term coastal resilience.

New Boat Stack Seawall

Client: Williamstown

Date Completed: Current

Total Contract Sum:

Description of works

Tas Marine Construction has been contracted to deliver a 200-metre long break wall at Williamstown.

The combination wall design consists of 16mm sheet piles with rock-socketed piles installed at every second sheet. With challenging hard basalt ground conditions, Tas Marine is applying its specialist hard rock drilling expertise to drill and concrete the piles into position. Completion is scheduled for late 2025.

Details of Innovations and extra value for money

Client Contact:

Travel Lift Jetties

Client: Royal Yacht Club of Victoria

Date Completed: Current

Total Contract Sum: 

Description of works

Tas Marine Construction was awarded the competitive tender to replace the Royal Yacht Club of Victoria’s aging travel lift jetties. 

Works include demolition of the existing jetties, installation of new piles, and the supply and fit of steel superstructure and precast deck units. The project is progressing on schedule and will be completed ahead of the arrival of the new travel lift in mid-October.

Details of any  Variations

Details of Innovations and extra value for money

Client Contact:

Waikawa Breakwall (NZ)

Client: Port Marlborough

Date Completed: Current

Total Contract Sum: $12.2M

Description of works

Construction of 500m long piled break-wall in up to 18m water depth. Precast wave panels are 8m deep weighing 25t. Total weight of structure 6000t.

Details of any Variations

Variations for additional PDA testing, pile lengths, pull out tests, acceleration and pile fins were approved and paid. Some painting was deleted and client was given a discount.

Details of Innovations and extra value for money  
Raker piles were not achieving tension capacity at contract lengths. We used pile offcut steel to manufacture spiral welded fins on the bottom of the piles which increased tension capacity.
Client Contact: Grant Beatie: +64 21239244

Bellerive Yacht Club new Marina arm

Client: Bellingham marine Australia
Date completed: Feb 2025
Total contract sum: $380,000
Description of works:
Supply and install steel piles with poly sleeves into rock. Take delivery of pontoons and assemble on water. Fit abutment and gangway. Install coverboard and buffer.
Details of Innovations and extra value for money:
TMC was able to use our new 40t crane for the duration to save hiring a crane. The trucks were often delayed so would have meant lots of variation charges if we had to hire a crane extra times
Client Contact: Mr Marc Carney